As part of the initial road-map for a project, we will create a list of ‘work-packages’ that comprise the project. From this we develop tender specifications that are the first step of the procurement process.
Every contractor’s appointment is documented in the same way: A specification, a quotation and a purchase order.
Where an event has particular requirements, for example to meet sustainability targets, these can be written into the initial tender specification.
Each supplier is required to provide essential H&S information, and will be provided with any particular site rules and instructions.
Vista also operate an approved contractor scheme, so regular contractors can be pre-vetted with all the relevant documentation held on file.
On site, Vista take the role of principal contractor, coordinating the health, safety and environmental issues for every company on site.
Part of the trilogy – budget, site plan and schedule, that are central to the planning of any event or production.
We prepare detailed site schedules covering the whole period on site (build, event and break), and for the event itself. Like all key documents, these are stored in our ECM system, allowing version control and update notifications compatible with management system standards ISO 9001, ISO14001 and OHSAS18001.
At Vista Health and Safety is integrated completely into our systems. There is no point bolting on H&S paperwork to an event, when noone reads it or complies with the stated procedures.
Policy and risk assessment are legal requirements. But actually managing H&S on the ground is the challenge.